BAC Infrastructure
BAC Infrastructure
Error: the field format must contains "%s" or "%1$s".
UPLB-I-008-04-25
SUPPLY AND DELIVERY OF CONSTRUCTION AND HARDWARE MATERIALS FOR UHO
BAC Infrastructure
PhP 1,296,950.00
UPLB-IF-016-04-25
UPGRADING OF ELECTRICAL LINES IN LOWER CAMPUS, UPLB, COLLEGE, LAGUNA (FORMER UPLB-IF-034-01-25)
BAC Infrastructure
PhP 27,272,723.27
UPLB-IF-015-04-25
REHABILITATION OF AGRICULTURAL MACHINERY TESTING AND EVALUATION CENTER (INSTALLATION OF SECONDARY ELECTRICAL FEEDER LINE CABLE AND BRAND NEW MAIN DISTRIBUTION ELECTRICAL PANEL BOARD), UPLB, COLLEGE, LAGUNA (FORMER UPLB-IF-032-01-25)
BAC Infrastructure
PhP 6,193,585.19
UPLB-IF-002-04-25 REBID
RENOVATION OF 2/F ADMINISTRATIVE OFFICE, IPB, CAFS, UPLB, COLLEGE, LAGUNA (FORMER UPLB-IF-029-12-24)
BAC Infrastructure
PhP 7,660,303.51
UPLB-IF-011-04-25 REBID
MODERNIZATION OF THE UPLB NATURAL HISTORY AND CENTER FOR TROPICAL BIODIVERSITY STUDIES MUSEUM (PHASE III-A) UPLB, COLLEGE, LAGUNA
BAC Infrastructure
PhP 1,041,964.49
UPLB-I-007-03-25
SUPPLY, DELIVERY AND INSTALLATION OF AIRCONDITIONING UNITS FOR CAS
BAC Infrastructure
PhP 593,829.15
UPLB-I-006-04-25
SUPPLY AND DELIVERY OF CONSTRUCTION AND HARDWARE MATERIALS FOR OSH
BAC Infrastructure
PhP 1,791,630.00
UPLB-I-005-03-25
SUPPLY, DELIVERY AND INSTALLATION OF AIRCONDITIONING UNITS FOR CAS
BAC Infrastructure
PhP 300,000.00
UPLB-I-002-02-25 REBID
SUPPLY AND DELIVERY BRANDED AND BRAND NEW POWER GENERATING SET INCLUDING LABOR AND MATERIALS FOR THE INSTALLATION, POSITIONING, HAULING, TESTING, COMMISSIONING, AND APPURTENANT ELECTRICAL AND CIVIL WORKS FOR BIOTECH IMMUNOLOGY LABORATORY (FORMER UPLB-I-017-04-24 REBID2)
BAC Infrastructure
PhP 4,000,000.00
UPLB-IF-014-03-25
COMPLETION OF UPLB NANOSCIENCE AND TECHNOLOGY FACILITY, UPLB, COLLEGE, LAGUNA
BAC Infrastructure
PhP 20,298,749.45
UPLB-IF-013-03-25
COMPLETION OF COMFORT ROOMS (PHASE II) 2/F CAS ANNEX 2 BLDG., UPLB, COLLEGE, LAGUNA
BAC Infrastructure
PhP 3,788,611.52
UPLB-IF-011-03-25
MODERNIZATION OF THE UPLB NATURAL HISTORY AND CENTER FOR TROPICAL BIODIVERSITY STUDIES MUSEUM (PHASE III-A) UPLB, COLLEGE, LAGUNA
BAC Infrastructure
PhP 1,041,964.49